Advanced layout simplified - Hilti layout system PLT 300



Contractors will find advanced layout simple with the Hilti Layout system PLT 300.  This new layout system makes everyday layout and measuring tasks easier than ever.  But best of all, layout jobs can be completed quickly and efficiently by just one person for increased productivity when compared to traditional methods.

 The PLT 300 virtually eliminates a learning curve as no leveling is required and the new Hilti Auto-Stationing technology allows for easy automatic station set-up.  Layout and recording jobsite information is made easy with a green laser pointer for greater visibility.

Built for tough jobsite conditions, the PLT 300 comes with the PLC 300 controller, a tablet with a 7 inch display that has permanent wireless contact with the total station putting the complete building plan in the palm of your hand.  Building Information Modeling (BIM) and “jobsite to BIM” data flow are now at your fingertips. The easy user interface makes it simple to use the system outdoors on the ground or on facades, or indoors on floors, ceilings and walls, and checking positions on plans and measurements for as-builts.

The Hilti Layout system PLT 300 is backed by Hilti’s Calibration Service to help ensure reliability and accuracy.  Even with Hilti’s built-in protection features, precision instruments can be affected by everyday use and more. Through the Calibration Service, the PLT 300 will be calibrated and adjusted as needed, with the calibration confirmed in writing.

The Hilti Layout system PLT 300 is covered by Hilti’s Tool Warranty 20/2/1 which consists of 20 years of repair or replacement of defective parts; 2 year no cost repair including wear and tear; and a guaranteed 1-day turn-around on repairs.*

For more information, visit www.us.hilti.com.

 



July 22, 2016


Topic Area: Press Release


Recent Posts

Strategies to Eradicate Biofilm Containing C. Auris

Understanding the speed and risks of contamination after room disinfection should inform managers’ environmental cleaning recommendations.


Man Attacks Nurses, Police Officer at Jefferson Hospital

The man allegedly attacked the staff members before being restrained and sedated.


Freeman Health System Breaks Ground on New Full-Service Hospital

The construction project will be completed in three phases, over a 24- to 34-month time period.


All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.