Armstrong Fluid Technology announces factory service plan for IPC Chiller Plant automation systems

By Healthcare Facilities Today


TORONTO — Armstrong Fluid Technology is pleased to announce the introduction of its Factory Service Plan for IPC chiller plant automation systems.

As products have become increasingly intelligent incorporating embedded controls, the skillset required to provide proper service becomes less generic and more dependent on factory-trained and qualified resources. Key aspects of the Factory Service Plan include: inspection and review of key components, assessment of operation conditions, control system tuning, software upgrades as they are released, back-up and secure storage of parameters and settings, and annual training for the Building Operators.

Mark Gallagher – Global Manager of Building Services states “the strong preference that customers have expressed for service from the Manufacturer played a big part in our introduction of the Factory Service Plan. The service will keep the chiller plant running as intended, which will lead to sustained optimal performance and increased overall plant uptime. Customers will enjoy a lower energy bill and get the maximum return for their investment in plant optimization.”

 About Armstrong Fluid Technology

With more than 1000 employees worldwide, operating seven manufacturing facilities on three continents, Armstrong Fluid Technology is known around the world as a leader and innovator in design, engineering and manufacturing of integrated solutions within the building oriented fluid-flow equipment industry. Armstrong products are internationally recognized for design innovation, quality, long service life, and superior operating economy. For more information about Armstrong Fluid Technology visit www.armstrongfluidtechnology.com.  



February 14, 2014


Topic Area: Press Release


Recent Posts

Strategies to Eradicate Biofilm Containing C. Auris

Understanding the speed and risks of contamination after room disinfection should inform managers’ environmental cleaning recommendations.


Man Attacks Nurses, Police Officer at Jefferson Hospital

The man allegedly attacked the staff members before being restrained and sedated.


Freeman Health System Breaks Ground on New Full-Service Hospital

The construction project will be completed in three phases, over a 24- to 34-month time period.


All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.