Connecticut VA Medical Center benefits from energy efficiency upgrades

VA Medical Center upgraded to high-efficiency interior lighting through the Energy Conscious Blueprint program


More than eight million veterans are provided access to healthcare through the U.S. Veterans Health Administration, the country’s largest healthcare system. As part of the federal program, the VA Connecticut Healthcare system encompasses two ambulatory care centers and six primary care community-based outpatient clinics across the state serving approximately 56,000 patients.

Under the Veterans Health Administration, VA Medical Centers have a number of energy conservation programs and construction goals to meet. Recently, the ambulatory care center and inpatient facility in West Haven, Conn., partnered with The United Illuminating Company (UI) to develop strategic plans and assess financial assistance for energy efficiency projects.  They aimed to minimize wasted resources and reduce operating costs to help meet their conservation goals.

With UI’s resources, the VA Medical Center upgraded to high-efficiency interior lighting through the Energy Conscious Blueprint program, as part of the Energize Connecticut initiative. The program provided assistance and installation of high-quality lighting systems, using cost-effective modern lighting technologies to replace old fixtures.

“Patient care is our top priority. The installation plan provided by Energize Connecticut was customized to our needs, making upgrades to one room at a time to accommodate our patient care areas,” said Joseph Simonetta of the VA Medical Center. “By investing in energy efficiency now, we’re saving money that can be put toward additional improvements in patient care in the future.” 

The VA Medical Center installed almost 50 high performance T8 fluorescent light fixtures in patient rooms, administration buildings, staff offices and utility rooms.  They received $1,667 in incentives to make the energy efficient upgrades. With the savings achieved, UI estimates the timeframe for the VA Medical Center to repay the cost of the project to be 2.3 years. Over a 15-year period, the lighting improvements are estimated to save 69,900 kwH annually or $12,500.

“For the medical and healthcare industry, we understand that patient care is prioritized above all else,” said Donna S. Wells, Director Energy Services Commercial and Industrial of The United Illuminating Company. “By working through the programs, energy efficiency upgrades are feasible for medical facilities, allowing them to reduce operating costs and focus on their primary goal.”

 



July 8, 2016


Topic Area: Energy and Power


Recent Posts

Rethinking Carpeting's Role in Senior Care Facilities

New research from the Carpet and Rug Institute finds that carpet supports healthier indoor environments.


Parkview Health Breaks Ground on New Hospital in West Lafayette, IN

The hospital is scheduled to open in June 2028.


Loma Linda University Health Experiences Data Breach via AI Tool

A file containing limited patient information was inadvertently uploaded to an external artificial intelligence (AI) platform.


Inside One of Healthcare's Most Ambitious Hospital Projects 

When someone faces a serious medical condition, having access to world-class care close to home can make all the difference. 


Turning Condensate Loss into a Systemwide Steam Efficiency Opportunity

Case study: How APM Steam helped Atrium Health Cabarrus uncover hidden steam system inefficiencies and build an actionable repair plan with a projected $144,949 in annual energy savings.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.