Linetec displays curved extrusions finished with Valspar’s Fluropon Effects Nova coatings


Fluropon Effects Nova BlackWausau, Wisconsin -- Highlighting its stretch forming and finishing capabilities during the American Institute of Architects (AIA) Convention and Expo, Linetec displays curved aluminum extrusions finished in Valspar's Fluropon® Effects new Nova color family.

Stretch Forming by Linetec allows architectural product manufacturers to have their metal building components curved and finished in one location. As one of the largest architectural finishing companies in the U.S., Linetec also is one of the only to provide thermal improvement services for curved and radius, finished aluminum extrusions backed with an industry-leading warranty.

Offering richer, deeper hues with an intense gold or silver sparkle, Valspar's Nova colors are part of Valspar's Fluropon Effects line of 70 percent polyvinylidene fluoride (PVDF) resin-based architectural coatings. Linetec has selected blue, black, orange and white as samples in booth #1143.

These finishes meet the stringent standards of AAMA 2605-13, providing outstanding color and gloss retention, withstanding extreme weathering, and resisting dirt, stains, chalking and fading. Durable finishes, thermal comfort and energy performance can be combined with recycled aluminum content, daylight, views and other environmental benefits for recognition by such green building and design guidelines as the U.S. Green Building System's LEED® certification.

curved extrusion with thermal strutUtilizing Linetec's dedicated fleet of trucks also saves customers shipping costs and transit time, as well as reduces material handling and packaging to minimize the opportunity for damage.

For more information about Linetec's thermal improvement, visit www.linetec.com.

 



May 20, 2016


Topic Area: Press Release


Recent Posts

Strategies to Eradicate Biofilm Containing C. Auris

Understanding the speed and risks of contamination after room disinfection should inform managers’ environmental cleaning recommendations.


Man Attacks Nurses, Police Officer at Jefferson Hospital

The man allegedly attacked the staff members before being restrained and sedated.


Freeman Health System Breaks Ground on New Full-Service Hospital

The construction project will be completed in three phases, over a 24- to 34-month time period.


All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.