New Titus Alpha controller family integrates universally

By Healthcare Facilities Today


DALLAS – Titus HVAC, the leader in air management, introduces the new Alpha controller family that integrates universally with all BACnet building management systems (BMS) regardless of manufacturer. The Alpha controller reduces common failures seen with typical “add-on” style designs of multiple connected components and are designed and manufactured in collaboration with KMC Controls, a standout in BACnet building automation.

Designed as a one-piece solution, the reliable Alpha features the advantages of an integrated controller, sensor, actuator and communication. It can be used in standalone and network applications, saves time and money during the installation by being pre-configured at the factory, and has the ability to be commissioned through the thermostat, eliminating software at the jobsite. Since the Alpha controller is stocked at the Titus factories, it eliminates the complication of coordinating controls and is available for quick ship requirements. 

“With BACnet protocol emerging as the leading worldwide standard for building management systems, we wanted to provide customers with the confidence of having a universal and reliable choice,” said Steve Attri, terminal unit manager at Titus HVAC. 

The new Alpha controls family includes the single duct cooling only; single duct with heat and fan powered application; as well as dual duct mixing and non-mixing. It is available with three sensor options: dial sensor, digital display and digital with occupancy sensor. 

For more information about the Titus Alpha Controls family and sensor options, visit www.titus-hvac.com. 

About Titus HVAC

As the world leader in advancing the science of air distribution and air management training, Titus HVAC works to make life better by improving the health, efficiency, sustainability, comfort and aesthetics in commercial building environments. Founded in 1946, Titus HVAC provides a breadth and depth of air management products and design tools that includes displacement ventilation, chilled beam, underfloor, grilles, diffusers, terminal units, fan coils and advanced training. For more information, visit www.titus-hvac.com, www.titus-energysolutions.com or call 972-212-4800. 

 



February 7, 2014


Topic Area: Press Release


Recent Posts

Strategies to Eradicate Biofilm Containing C. Auris

Understanding the speed and risks of contamination after room disinfection should inform managers’ environmental cleaning recommendations.


Man Attacks Nurses, Police Officer at Jefferson Hospital

The man allegedly attacked the staff members before being restrained and sedated.


Freeman Health System Breaks Ground on New Full-Service Hospital

The construction project will be completed in three phases, over a 24- to 34-month time period.


All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.