Tubelite debuts 34000 Series storefront


Walker, Michigan - Tubelite introduces 34000 Series storefront system, engineered for hurricane resistance. This new product will be on display in booth #4634 at the American Institute of Architects (AIA) Convention and Expo 2014.

Tubelite’s new 34000 Series storefront is offered as either a non-thermal system or with a single poured-and-debridged thermal improvement option. Both choices easily accommodate insulated glass. 

Enhancing the product’s environmental attributes, the aluminum used to produce Tubelite’s storefront systems can be extruded using EcoLuminum™, a high recycled-content aluminum billet composition with eco-friendly, durable finishes. 

To learn more about Tubelite’s new 34000 Series storefront system design details, test reports, installation instruction and specific performance data, please visit http://www.tubeliteinc.com.

Tubelite was established in 1945 and is part of Apogee Enterprises, Inc. The company’s headquarters, distribution, warehousing and assembly operations are in Walker, Michigan. Its facility in Reed City, Michigan, houses the company’s aluminum extrusion operation. In 2011, the company expanded with an additional facility in Dallas/Fort Worth, Texas, and offices in Rockhill, South Carolina, to better serve clients working in the southern states. 

Tubelite and its staff are members of the American Architectural Manufacturers Association (AAMA), the American Institute of Architects (AIA), the Construction Specifications Institute (CSI), the Glass Association of North America (GANA), and the U.S. Green Building Council (USGBC).

 



June 26, 2014


Topic Area: Press Release


Recent Posts

Strategies to Eradicate Biofilm Containing C. Auris

Understanding the speed and risks of contamination after room disinfection should inform managers’ environmental cleaning recommendations.


Man Attacks Nurses, Police Officer at Jefferson Hospital

The man allegedly attacked the staff members before being restrained and sedated.


Freeman Health System Breaks Ground on New Full-Service Hospital

The construction project will be completed in three phases, over a 24- to 34-month time period.


All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.