AJ Manufacturing, a leading manufacturer of critical environment HVAC products, has introduced a portable version of its Reverse Flow Criti-Clean Ultra™ Fan Filter Unit (FFU) to quickly and easily create patient isolation rooms. The new units were specifically developed to help protect healthcare workers treating COVID-19 patients and to help reduce the spread of the virus.
Like the original ceiling-mounted model, the portable Reverse Flow Criti-Clean Ultra™ FFU connects to existing ductwork and creates a negative pressure environment that removes the air from a patient room and cleans it via the unit’s built-in HEPA filter, keeping airborne contaminants from escaping. The unit comes on wheels for easy movement and can be plugged into a standard electrical wall outlet.
“We’re proud to be able to do our small part to help protect healthcare workers who are treating the growing number of coronavirus patients,” said Rob Haake, president of AJ Manufacturing. “Our plant is 100% focused on producing both our permanent and portable FFU models for as long as they are needed to help stop the spread of the virus.”
In addition to reverse flow units that take in air and remove it from a room, standard FFU models – both ceiling mounted and portable – are also available to bring HEPA filtered air into a room. AJ’s ceiling mounted FFUs offer the industry’s lowest plenum height of just 13.7″, allowing easier retrofitting into existing ceiling spaces.
For more information, contact AJ Manufacturing at 816-231-5522 or visit www.ajmfg.com.
April 15, 2020
Topic Area: Press Release
Recent Posts
Waco Family Medicine Achieves Savings and Bold Design with Wood Selections
Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.
Alleged Ransomware Administrator Extradited from South Korea
The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.
Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital
The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.
Ground Broken on New Pediatric Health Campus in Dallas
The new campus will replace the existing Children’s Medical Center Dallas.
Pre-Construction Strategies for Successful Facilities Projects
Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.