AJ Manufacturing Introduces Portable Air Filtration Units for Creating COVID-19 Patient Isolation Rooms


AJ Manufacturing, a leading manufacturer of critical environment HVAC products, has introduced a portable version of its Reverse Flow Criti-Clean Ultra™ Fan Filter Unit (FFU) to quickly and easily create patient isolation rooms. The new units were specifically developed to help protect healthcare workers treating COVID-19 patients and to help reduce the spread of the virus.
 
Like the original ceiling-mounted model, the portable Reverse Flow Criti-Clean Ultra™ FFU connects to existing ductwork and creates a negative pressure environment that removes the air from a patient room and cleans it via the unit’s built-in HEPA filter, keeping airborne contaminants from escaping. The unit comes on wheels for easy movement and can be plugged into a standard electrical wall outlet.
 
“We’re proud to be able to do our small part to help protect healthcare workers who are treating the growing number of coronavirus patients,” said Rob Haake, president of AJ Manufacturing. “Our plant is 100% focused on producing both our permanent and portable FFU models for as long as they are needed to help stop the spread of the virus.”
 
In addition to reverse flow units that take in air and remove it from a room, standard FFU models – both ceiling mounted and portable – are also available to bring HEPA filtered air into a room. AJ’s ceiling mounted FFUs offer the industry’s lowest plenum height of just 13.7″, allowing easier retrofitting into existing ceiling spaces.

For more information, contact AJ Manufacturing at 816-231-5522 or visit www.ajmfg.com.



June 19, 2020


Topic Area: Press Release


Recent Posts

3 Ways to Secure a Healthcare Facility

As workplace violence grows in healthcare, being aware of different security methods can help prevent and address dangerous situations.


Use Cases for Insulated Metal Panels in Healthcare Building Projects

Case study: The UC Medical Center selected IMPs for its ongoing revitalization project.


Memorial Healthcare System Plans Two New Freestanding Emergency Departments

Construction is expected to begin in early 2025 and complete by mid 2026.


Communication Proves to Be Essential Task During Design Phase

Projects go over more smoothly when people are transparent and communicating openly.


Northwest Healthcare Acquires Carbon Health Urgent Care Centers in Arizona

With this acquisition, Northwest Healthcare has more than 80 sites of care.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.