Action Floor Systems introduces action Aero Sports floor systems


Action Aero-NR Comp Gym Olympus HSAction Floor Systems, LLC introduces the Action Aero NR and HL anchored fixed resilient wood sports floor systems. The Action Aero systems utilize factory-assembled panels with natural rubber pads that permit air circulation throughout the subfloor structure. The Action Aero NR allows for incremental movement as a system when the floor expands or contracts. Designed for applications where the added loads of taller bleachers are encountered, the Action Aero HL maintains the floor’s performance characteristics of exceptional playability, uniformity and resiliency. These factory-assembled systems enable faster, more efficient installation at the jobsite. Ideal for recreation halls and clubs, the EN/DIN and FIBA certified Action Aero NR and Aero HL systems fit well in facilities where player well-being and floor system performance are a priority.

Action Floor Systems, LLC manufactures a wide selection of high-performance hardwood sports floor systems, and also offers Action QuickCourt™, a new series of modular multisport floor systems, Action Herculan® polyurethane synthetic systems, Action RexCourt® vinyl sheet, Action ReFlex® recycled rubber flooring products, and the patented Action AirRide floor cover systems.

Action Floor Systems has been certified as a Carbon Negative Footprint provider following a Life Cycle Assessment conducted by the University of Wisconsin and Carbon Clear, an international independent auditor of manufacturing carbon profiles. Action Floor Systems is the only Maple Flooring Manufacturers Association (MFMA) member to receive this independently audited accreditation.

For more information, contact Action Floor Systems, 4781 North U.S. Highway 51 Mercer, WI 54547-9708 Phone 1.800.746.3512 Fax 715.476.3585 E-mail info@actionfloors.com or visit www.actionfloors.com   



September 29, 2014


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.