Ameresco Partners with UCI Health to Power All-Electric, Zero-Emission Hospital Campus

Solar photovoltaic arrays will power the all-electric medical campus.

By HFT Staff


Ameresco, Inc. announced its collaboration with the University of California, Irvine and its health system, UCI Health, to install two solar photovoltaic (PV) arrays atop new parking structures at the innovative, all-electric, zero-emission medical campus with the acute care hospital set to open in 2025. This initiative represents a major step towards UCI Health’s goal of achieving carbon neutrality and procuring 100 percent clean energy, making the new UCI Health – Irvine Campus Medical Complex in addition to The Joe C. Wen & Family Center for Advanced Care one of the most sustainable healthcare facilities in the nation. 

Ameresco is responsible for the turnkey design, engineering, arrangement of financing and construction of the new PV systems. In addition, Ameresco will provide operation and maintenance services to ensure optimal system performance over the full 25-year power purchase agreement (PPA) term. The PV arrays, with a combined capacity of approximately 1.4 MW, are expected to generate over 2.3 million kWh of clean energy in the first year alone equivalent to the annual energy consumption of over 200 homes. 

The UCI Health – Irvine medical campus opened in 2024, with outpatient care at the Joe C. Wen & Family Center for Advanced Care and the Chao Family Comprehensive Cancer Center and Ambulatory Care building. The final phase includes a 144-bed acute care hospital and is slated to open in 2025, providing state-of-the-art medical care to the surrounding community. 



November 19, 2024


Topic Area: Energy and Power


Recent Posts

Inside Good Shepherd Rehabilitation Hospital's Modern Transformation

The newly transformed facility was designed to incorporate materials and spaces to benefit patient healing.


Report Sheds Light on Cyberattack and Data Breach Trends from 2024

Despite a slight decrease in data breaches from 2023, the volume of exposed data and records surged.


Hampstead Hospital Officially Joins Dartmouth Health

This will make Dartmouth solely responsible for the clinical leadership, patient care and operation of Hampstead Hospital and Residential Treatment Facility.


HCA Florida Healthcare Announces Plans for Three New Freestanding ERs

Construction is expected to begin on the three facilities in 2025, with completion anticipated in 2026.


Barriers to Infection: Rethinking Mattress Cleaning

Laundering removable bed barriers provides a more effective, consistent and safer method for eliminating harmful bacteria compared to manual cleaning.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.