Bally Ribbon Mills Announces Safety Webbing and Tapes for Fire Fighting


Bally Ribbon Mills (BRM), a manufacturer of highly specialized engineered woven fabrics, announces its line of safety webbing and tapes, ideal for demanding fire and rescue applications.

BRM’s safety webbing and tapes are ideal for applications requiring flame and heat resistance high tenacity, and abrasion resistance. The fibers that are available are Nylon, Nomex®, Kevlar®, Vectran®, PBI®, Nextel®, and other specialty fiber solutions. BRM’s Safety webbing and tapes can be used for shoulder straps, harness webbing, and chin straps, as well as helmet suspension, binding tapes, lap belts, and shock absorbing webbing.

BRM’s safety webbing and tapes line includes performance materials that meet United States (NFPA) requirements for fire fighters’ protective clothing and equipment:

-          Protective Clothing and Ensembles for Proximity Fire Fighting – Component (NFPA 1971-2018)

-          Protective Garments, Hoods and Ensembles for Structural Fire Fighting – Component (NFPA 1971-2018)

-          Protective Clothing and Equipment for Wildland Fire Fighting – Component (NPFA 1977-2016)

BRM’s American-made safety webbing and tapes offer conductivity, dimensional stability and strength, and can help to minimize weight and size. They are excellent choices for controlled elongation applications as well as those requiring chemical resistance in specific environments.

For more information about BRM safety webbings and tapes, visit www.ballyribbon.com/safety-webbing.



January 17, 2020


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.