Butler Automatic Launches SP3HSL Series Automatic Film Splicer


 Butler Automatic, the inventor and global leader of automatic splicing solutions, announces its new SP3HSL Series Automatic Film Splicer. The SP3HSL Series Automatic Film Splicer, an automatic web splicing system for printed sleeve films, will increase line efficiency in sleeved packaging operations by eliminating film roll change downtime. Film roll changes must occur in shrink sleeve packaging applications as frequently as once every 18 minutes, and changing the roll by hand wastes one to three minutes of production time. By incorporating the SP3 Automatic Sleeve Splicer, roll change time is eliminated, thereby increasing line efficiency by 9% or more in these applications.

“This product was originally developed to solve an efficiency problem for one key customer of Butler Automatic,” said Mike Mucci, Vice President of Engineering at Butler Automatic.  “This particular customer will increase line efficiency by 9%, leading to a payback on their investment of less 3 months.”

Capable of running at speeds of up to 450 feet per minute (FPM), the SP3HSL automatically splices the end of each expiring roll of film onto the new roll. The technology is ideally suited for increasing production time in Consumer Packaged Goods and Pharmaceutical applications utilizing shrink sleeve packaging.

The Butler Automatic Sleeve Splicer will be sold both through OEM machine builders for new production lines, and for retro-fit installation on existing packaging lines.

For more information call 508-923-0544 or visit www.butlerautomatic.com.

 



June 26, 2017


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.