CENTRIA Formawall Completes Clemson University International Center for Automotive Research


One Research Drive is home to the Clemson University International Center for Automotive Research (ICAR). CENTRIA®, the world’s leading provider of high-performance building envelopes, contributed more than 13,000 square feet of Formawall™ to the building façade, which visually echoes nearby campus buildings also clad in Formawall.

“We aimed to have the material connection across all facades, – the ICAR and the Center for Emerging Technologies – in addition to the same durability and speed of installation we enjoyed with the Emerging Technologies project,” says Chris Stone, Associate Principal, LS3P, the firm responsible for the building design.  

The 85,000 square-foot structure aesthetically unites other nearby Clemson structures with the same clean lines and modern aesthetic. The design team with LS3P associates leveraged the sleek exterior and consistency afforded by working with Formawall.

“We utilized the CENTRIA panels in a continuous ribbon across the building, which enabled it to have a uniform, distinct façade: Its 4 sides all have prominent frontage and CENTRIA panels formed the primary skin that wrapped around the entire building,” says Stone.

Formawall is CENTRIA’s flagship line of insulated metal panels, combining unprecedented design freedom with unmatched performance. The product’s five distinct profiles deliver unlimited design combinations and create the world’s most imaginative building envelopes with varying articulations, rhythms, and textures. 

Not only did Formawall provide the optimal building façade for Clemson’s needs, but the design team also opted to use the product for its accelerated and seamless installation capabilities.

“We have been working with CENTRIA products for quite some time and find that their speed of installation, longevity, and durability are all factors that make them ideal for our needs,” says Stone. “At the International Center for Automotive Research, the CENTRIA product was installed quickly enough to get the core and shell enclosed on-schedule.”

Other members of the design and construction team included general contractor, Sherman Construction, and CENTRIA dealer, Steel Clad, Inc.  



October 11, 2019


Topic Area: Press Release


Recent Posts

How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


Healthcare is a Major Ransomware Target

Healthcare is the third-most-targeted sector, according to the report.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.