CENTRIA Formawall and Integrated Formavue Windows Enhance Salish Cancer Center Exterior


The Salish Integrative Oncology Care Center is the first ever tribal-owned cancer care facility in the Native American community and the United States as a whole.

More than 28,000 square feet for CENTRIA Formawall was installed on the building’s exterior to create the desired all-metal aesthetic and provide multiple lines of defense against water infiltration. 

The addition of 12,000 square feet of integrated Formavue windows forged the complete wall system with fully integrated details and CENTRIA’s advanced thermal and moisture performance (ATMP®) technology.

“The CENTRIA system was not only light but incorporated an exterior insulation that would meet energy code requirements for even a new building,” says project architect Chris Tongray, of TGB Architects. “Additionally, the CENTRIA system was sole-source, with windows and panels by a single manufacturer installed by a single subcontractor as a single system.”

Formawall is CENTRIA’s flagship line of insulated metal panels, combining unprecedented design freedom with unmatched performance. The product’s five distinct profiles deliver unlimited design combinations and create the world’s most imaginative building envelopes with varying articulations, rhythms, and textures.

The high-performing system was also successfully able to achieve the modern aesthetic desired by the building owners, the Puyallup Tribe, who purchased the structure in 2015. The Tribe founded the hospital to create a truly unique form of care, blending traditional oncology treatments with integrative medicine techniques like naturopathy and acupuncture.

The team from TGB Architects specified the mottled, natural finish provided by CENTRIA’s AllusionTM Rust print coat system, designed to simulate natural materials like wood, slate, bronze or zinc. 

“The client is very satisfied with the project thus far,” says Tongray. “The contractors on-site have said that ‘everyone loves it.’”

The Salish Cancer Center was completed in August, 2016. TGB Architects provided architectural services, Andersen Construction was the general contractor, and the CENTRIA dealer/installer was Cobra BEC, Inc. Morrison Hershfield was brought on board as a wall consultant.

For more information about CENTRIA products visit www.centria.com.



September 19, 2019


Topic Area: Press Release


Recent Posts

Disinfectant Dispensers in Healthcare Facilities Often Fail to Deliver Safe Concentrations: Study

Study of 10 hospitals finds 90 percent have at least one dispenser delivering disinfectants at incorrect concentrations.


Duke University Health System Receives $50 Million for Proton Beam Therapy Center

The donation is the largest philanthropic gift received by Duke University Health System.


UT Southwestern Experiences Data Breach Through Calendar Tool

The incident occurred in October.


Protecting Patient Data: Strategies and Tactics

As cyber threats and breaches grow, healthcare organizations and facilities need a better approach to cybersecurity.


Duke Health to Acquire Lake Norman Regional Medical Center

The closing is projected for the first quarter of 2025.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.