Cardiovascular facility built with complex smoke-control system

Atrium size and building code required a large amount of outdoor air to be supplied to the atrium built with complex smoke-control system


The atrium size and building code of a cardiovascular facility in a northern climate required a large amount of outdoor air (OA) to be supplied to the atrium, according to an article on the Consulting- Specifying Engineer website.

The five-level, 400,000-square-foot cardiovascular center had tight site constraints and connections to adjacent buildings. This created the need for planning that placed the building air-handling units and fans on level five in a two-level mechanical room, with supply and return ductwork routed vertically in chases to the levels below, the article said. 

Building pressurization and ventilation were satisfied through the make-up air requirements with the HVAC design incorporating two OA-pretreat units. 

An additional function of these units was to provide treated make-up air to the atrium in locations and at velocities that met code requirements related to a potential fire origin in the atrium. 

Read the article.

 

 



November 30, 2015



Recent Posts

Protecting Patients from C. auris Through Bed and Mattress Safety

Managers face an urgent question: What happens when a colonized patient returns to a contaminated mattress?


Geisinger Wyoming Valley Medical Center Tops Off New Acute Care Tower

The new acute care tower, designed by FCA, will enhance the hospital’s ability to serve patients by incorporating facilities and expanding its range of services.


Adena Health Finalizes Acquiring Fairfield Medical Center

Fairfield Medical Center will now be known as Adena Fairfield Medical Center, marking a new chapter for the hospital.


Every Detail Matters: A Patient's Story of Healing, Hope and Healthcare Facilities

In the Facilities in Focus season finale, 11-year-old Kendalynn and her mother share how Intermountain Primary Children’s Hospital became more than a place for care.


Enhancing Safety at Hennepin Healthcare with a Screening System

Case study: The system was able to detect 2,500 risk items in less than five months.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.