Construction Kicks Off on Health First Cape Canaveral Replacement Hospital

The new replacement hospital was designed by Lawrence Group architects.

By HFT Staff


Construction has officially kicked-off on a $410 million Health First Cape Canaveral replacement hospital, parking garage and medical office building in Merritt Island, Florida, designed by Lawrence Group architects. 

The new 120-bed hospital, three-deck parking structure and 92,000-square-foot medical office building will replace Health First’s Cape Canaveral Hospital in Cocoa Beach, as part of its new campus. 

Health First announced plans to open its new hospital and medical office building in early 2027, at which time the original Cape Canaveral Hospital would be closed. Gilbane Building Company is the general contractor on the project. Headquartered in St. Louis, Lawrence Group’s Florida office will provide local support to ensure that the project runs seamlessly and is completed on time and within budget. 

The 268,000-square-foot replacement hospital is being built on a 14-acre site, four miles inland from the original Cape Canaveral Hospital located on reclaimed land in the Banana River. Constructed in the 1960s, the six-story, 150-bed hospital was targeted for replacement, in part, due to its vulnerability to hurricanes and risk of flooding. 

To protect the new hospital from flooding during storm surges, Lawrence Group designed its ground floor 13 feet above sea level, and its exterior envelope and structure over and above code requirements to withstand a Category 4 hurricane. Additionally, the campus will be served by an on-site central energy plant, built to ensure continuous power function even during tropical storms and hurricanes. 

Incorporating the latest in patient-centered healthcare design, Lawrence Group planned the new hospital with 120 inpatient beds, 25 emergency department treatment bays and six operating suites. Lawrence Group also designed the three-story medical office building for specialty services, as well as the campus’ parking garage and lot. 

Extensive landscaping designed by Lawrence Group allows the new hospital and medical office building to integrate seamlessly into its existing environment, while providing room for greenspace, a half-mile walking trail and other connections to nature throughout the new campus.



March 28, 2024


Topic Area: Construction


Recent Posts

What Does Light Daily Cleaning Miss in Patient Rooms?

Most environmental services workers still clean as if they are wiping dust off a countertop, not disrupting a living, structured community.


Smart Lighting Overhaul Boosts Efficiency, Diagnostics and Wellness at Bryan Health

Case study: LED upgrade and advanced controls across Bryan Health campuses cut lighting energy use by 57 percent while enhancing patient care and staff productivity.


AdventHealth Opens New Freestanding ER in Florida

The approximately 13,700-square-foot emergency room features 12 patient rooms, respiratory therapy services, diagnostic imaging including CT scans, X-ray and ultrasound.


Dirty Floors: How Pathogens Can Accumulate and Spread Underfoot

Studies show that healthcare floors are covered in bacteria and can quickly spread throughout patient rooms. 


WellSpan Health Opens Its Newberry Hospital in Pennsylvania

This marks the opening of its 10th hospital in the region spanning Central Pennsylvania and Northern Maryland.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.