Drain Cleaner Can Boost Productivity


With the versatility to handle 1-1/4” to 4” drain lines, General Pipe Cleaners' Root 66 is three machines in one.

Designed to clear practically any inside or rooftop drain, the Root 66 sectional cable power drain cleaner uses 5/8" or 7/8" sections interchangeably. There's no need for adapters or tools to switch from one cable size to the other. 

Need to clear sinks and other small drain lines? Get the optional drum with smaller 1/4", 5/16” or 3/8” Flexicore cables. Just slide onto the back of Root 66, and you’re ready to go. 

A General exclusive, optional 7/8" Proflex sectional cables (15R10-P) sport an inner spring. It gives the cable greater strength to transfer extra torque down the line for additional cutting power. 

Operating Root 66 is easy, too. Depress the drive handle for plenty of cable torque from the 1/2 hp capacitor motor. Release the drive handle and the cable immediately stops rotating – for no additional torque build-up. A wide, four-point base adds greater stability, and an optional dolly offers easy transport over long distances. 

Other accessories include cable carriers, the optional drum for small drain work, and a toolbox. Standard equipment includes a ground fault circuit interrupter, double palm leather gloves, rear guide hose, and General’s tradition of quality, performance and reliability.



July 5, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.