Duro-Last, Inc. adds flute fill combo board to their Duro-Guard insulation product line


SAGINAW, MICHIGAN – Duro-Last, Inc. announces an addition to its Duro-Guard insulation product line with EPS Flute Fill Combo Board for another Time off the Roof™ solution.

Duro-Guard EPS Flute Fill Combo Boards combine flute fill with the 4’x8’ flat panels. The custom formed EPS board is available with a factory laminated fire rated coated-glass fiber mat or a polyester facer over the EPS insulation. The one-step insulation installation will speed up installations and reduce labor on metal building retro-fit applications. Duro-Guard EPS Flute Fill Combo Board may be used directly under Duro-Last, Duro-Tuff® or Duro-Fleece® membranes without the use of a separator sheet.

Duro-Guard EPS Flute Fill Combo Boards are specifically designed for metal building retro-fit applications that employ mechanically attached or Duro-Bond® induction welding systems. The advantages of using the EPS Flute Fill Combo Board is the reduced labor from single-piece construction combined with a laminated facer which eliminates the need of a separator sheet. Other benefits include: code approvals, stable R-values, moisture resistance, and environmentally friendliness. The EPS Flute Fill Combo Board has no formaldehyde or ozone-depleting CFC’s or HCFC’s. It also contains 25% recycled material and is 100% recyclable.  

Duro-Last is known for prefabricated roofs, custom curbs and stacks, renowned quality assurance and technical field services, as well as industry-leading warranties. The addition of the EPS Flute Fill Combo Board provides Duro-Last customers with another Time off the Roof solution, one of several new options to save you time and money.

About Duro-Last®, Inc. 

Known as the “World’s Best Roof®”, Duro-Last®, Inc. is the world's largest manufacturer of custom prefabricated, thermoplastic single-ply roofing systems.  Factory controlled custom prefabrication eliminates up to 85% of field seams, resulting in lower on-site labor costs and easier installation. This highly sustainable and extremely durable roofing system is leak-proof, virtually maintenance-free and resistant to chemicals, fire, punctures, and high winds. Over two billion square feet of Duro-Last membrane has been installed throughout North America. Duro-Last is headquartered in Saginaw, Michigan with additional manufacturing facilities in Grants Pass, Oregon; Jackson, Mississippi; Sigourney, Iowa, and Carrollton, Texas. For more information on Duro-Last, call 800-248-0280 or visit www.duro-last.com.

 

 

 

 



April 15, 2014


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.