Engineer panel addresses hospital sustainability, safety issues

Health care clients demanding that their facilities are energy-efficient as well as safe

By Healthcare Facilities Today


Engineers Michael Chow, George Isherwood, and Michael Lentz address a variety of healthcare sustainability, safety issues in a series of Q&As on the Consulting-Specifying Engineer website.

Chow, is a member/owner of Metro CD Engineering LLC, Powell, Ohio; Isherwood is vice president of Peter Basso Associates, Troy, Mich. and Lentz is an associate at RMF Engineering, Baltimore.

CSE: What software or systems do you use to model the energy consumption of the building?

Lentz: The two programs that we most commonly use are Carrier Hourly Analysis Program (HAP) and the Dept. of Energy’s eQUEST. These programs allow us to model the exterior of the building and evaluate several different HVAC systems throughout the building at the same time. We can see which system will have the most energy savings, and then evaluate that system from a maintenance perspective as well as evaluate if the system is a practical application for the building. This is especially helpful on existing buildings when looking to replace the existing HVAC system that is beyond its useful life. We can evaluate the existing skin and windows of the building and see if a total change in not only the HVAC system, but the type of HVAC system is warranted, cost-effective, and the correct engineering solution for the building. 

CSE: ASHRAE has a goal: net-zero energy for all new buildings by 2030. What do other engineers need to know to achieve this goal on their hospital projects? 

Chow: Engineers need to know that a net-zero energy hospital project should incorporate integrated project delivery (IPD). Also, extensive energy modeling analysis will need to be performed as well as integrating innovative design strategies and including both on-site and off-site renewable energy sources.

Read the Q&As.

 

 



December 4, 2013



Recent Posts

Streamlined Integrated Project Delivery Tackles Design Challenges

Successful implementation of IPD Light can improve patient care, project outcomes and bottom lines.


Encompass Health Rehabilitation Hospital of Central Florida - Sumter County Opens

It is a satellite location of Encompass Health Rehabilitation Hospital of Central Florida.


Rudolph and Sletten Awarded $960M for New UCSF Benioff Children's Hospital

Construction work is expected to commence in September 2025 with substantial completion anticipated in 2031.


How Designers Create Welcoming Senior Care Communities

Risk assessments and cost analysis play a role in creating thriving communities.


Data-Driven Decisions: How Analytics Are Shaping Healthcare Facility Planning

Hospitals can use data to prioritize upgrades, extend building lifespans and maximize the impact of limited capital budgets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.