Fred Hutchinson Cancer Center Opens New Clinic on South Lake Union Campus

The outpatient cancer treatment clinic is six-stories and 150,000 square-feet.

By HFT Staff


Fred Hutchinson Cancer Center opened its new clinic building on the South Lake Union (SLU) campus. The six-story, 150,000 square-foot outpatient cancer treatment clinic features a patient-centered design, highly specialized treatment clinics and procedure suites. The new environment further advances the ability to deliver cancer care and conduct research. 

Replicating a current treatment model -- the building will continue to incorporate the concept of care neighborhoods, an approach that reduces the need for patients to move around the clinic to receive certain aspects of their care. 

To ensure patients’ needs were being met in this new clinical space, Fred Hutch enlisted a team of patient advisors who reviewed floor plans and provided critical feedback that helped shape the building’s design. 

The new building also expands its imaging and procedural capabilities with the addition of a computerized tomography CT Angiography suite; a first-of-its-kind in the Pacific Northwest, Positron emission tomography–magnetic resonance imaging (PET-MR), and new biopsy services. 

A pedestrian bridge connects the new and existing buildings. The new building also features a fully automated parking garage; a three-level robotic parking garage with space for 160 cars. Patients will drop off their vehicle with a centralized valet who will transport the car to one of the garage’s three stories with robotic lifts and platforms that shift cars vertically and horizontally. 

It is expected that every floor will be operational by the end of June 2023. 



April 4, 2023


Topic Area: Construction


Recent Posts

UF Health Hospitals Rely on Green Globes to Realize Their Full Potential

Case study: The process encouraged the team to push themselves in several areas.


How Healthcare Facilities Can Be Truly Disaster-Resilient

Real resilience looks different than what’s written down in plans


TriasMD Breaks Ground on DISC Surgery Center for San Fernando Valley

It is set to open in Q3 2025


Bigfork Valley Hospital Falls Victim to Data Breach

The incident occurred in November 2024


AI-Driven Facilities: Strategic Planning and Cost Management 

6 factors to ensure infrastructure, operations and financial management support AI’s integration


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.