Fresh-Aire UV introduces a free UV-C demonstration trial program for commercial/industrial building owners

By Healthcare Facilities Today


Fresh-Aire UV, Jupiter, Fla., is now offering a free on-site ultraviolet germicidal irradiation (UVGI) system demonstration trial and analysis for commercial/industrial HVAC air-conditioning systems used in healthcare, industry, hospitality, education and office buildings.

The free UV-C Demonstration Trial Program is available throughout 2014 to any HVAC/R contractor or their building owner clients in the continental U.S. by visiting www.freshaireuv.com or calling 800-741-1195. The free program, which kicked off at the Fresh-Aire UV (Triatomic Environmental) 2014 AHR Expo booth in New York City Jan. 21,  is valued at several thousand dollars per trial.

Applicants fill out a form indicating HVAC system size, age, and maintenance history and other background information. If eligible, a licensed, Fresh-Aire UV-certified HVAC/R technician will provide a free before-and-after onsite mechanical equipment analysis detailing more than a dozen parameters such as HVAC system surface microbial growth issues, static pressure, temperature differentials, VFD history analysis, etc. Then a free temporary demonstration UV-C light system will be installed via a magnetically-mounted assembly and plug-in power supply. "We want the most difficult air handlers to maintain so we can prove our technology to end-users that haven't experienced the benefits of UVGI technology," said Chris Willette, president, Fresh-Aire UV, inventor of the popular Blue-Tube UV®  24-VAC low-voltage UV system.

Eligible commercial/industrial buildings must have more than one air handling unit of at least 10,000-cfm. Besides microbial control, buildings with odor challenges are also eligible for a free volatile odor ororganic compound (VOC) control demonstration trial with Fresh-Aire UV's APCO air purification system, which combines UVGI, gas-phase air purification and photocatalytic oxidation (PCO) technologies.  

After the 60-day trial, end-users have the option of purchasing the equipment.   



January 12, 2014


Topic Area: Press Release


Recent Posts

Two Steps to Controlling the Hot Zone

Strategy for disrupting dry-surface biofilm begins with a simple premise: You cannot disinfect what you cannot reach.


RiverSpring Living Breaks Ground on River's Edge Senior Living Community

Occupancy is expected in December 2028.


Encompass Health Reveals Plans to Build Inpatient Rehabilitation Hospital in Post Falls, Idaho

The hospital is expected to open in 2028 and will be part of Encompass Health's national network of inpatient rehabilitation hospitals.


Creating Compassionate Spaces in Healthcare

A new bereavement room at the Children’s Hospital of Michigan NICU aims to provide peace and privacy for families.


Study Shows Connection Between Odor and Patient Experience

A 2024 study identifies the top smells in hospital waiting rooms and how they impact the patient and visitor experience.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.