Greenheck’s Energy Core Ventilator Line Continues to Grow


Energy Core Ventilators (ECV) from Greenheck transfer both sensible (heat) and latent (moisture) energy between the exhaust and supply airstreams without the airstreams mixing. The energy recovery core separates the supply and exhaust air, ensuring only fresh air is introduced into the indoor space while providing superior heat transfer and moisture permeability.

Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers. The new polymer membrane energy core allows for low air-side pressure differentials, increasing ECV airflow capacity by 15% per housing size versus a fiber membrane. The polymer and aluminum material provides increased thermal effectiveness and allows for easy washable maintenance. Designed for indoor and outdoor mounting for commercial applications requiring 500 to 3,750 cfm of ventilation air and up to 1 in. wg, the ECV-PM is ideal for office buildings, schools, hospitals, churches, dormitories and nursing homes.

Greenheck is the worldwide leader in manufacturing and distributing air movement, conditioning and control equipment. 

For more information, contact Greenheck, P.O. Box 410, Schofield, WI 54476-0410, (715) 359-6171, FAX (715) 355-2399 or visit www.greenheck.com



October 18, 2019


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.