Hackensack University Medical Center Opens the Helena Theurer Pavilion

The Pavilion is a nine-story surgical and intensive care tower.

By HFT Staff


Hackensack University Medical Center opened its 530,000-square-foot Helena Theurer Pavilion. The nine-story surgical and intensive care tower was designed in collaboration with RSC Architects and Page.  

The Pavilion includes: 

  • An intraoperative MRI system, used during neurosurgical and neuro-interventional procedures to help neurosurgeons accurately remove tumors and treat conditions such as Parkinson’s disease, epilepsy, and more 
  • 24 operating rooms; six specially designed to accommodate robotic-assisted surgery systems, allowing nationally and internationally recognized surgeons to perform minimally invasive procedures that may reduce recovery time and improve outcomes 
  • 72 post-anesthesia care unit beds and 50 Intensive Care Unit (ICU) beds 
  • 175 medical/surgical beds, including a Musculoskeletal Institute and intermediate care rooms 
  • 12 negative-pressure rooms to reduce the risk of aerosolized disease transmission within the hospital environment. The entire Pavilion can also be converted to a negative-pressure facility in the event of a future pandemic or public health emergency. 
  • Six da Vinci robotic surgical systems, including one single port system and four orthopedic robots for joint replacement procedures 

All-private patient rooms 

In addition to incorporating features that focus on patient comfort, the facility promotes patient safety and team member efficiency. This includes dedicated CT imaging on the ICU floor, a monitor tablet outside each patient room that provides information for team members, in-room team workstations and patient lift systems. 



February 23, 2023


Topic Area: Construction


Recent Posts

UF Health Hospitals Rely on Green Globes to Realize Their Full Potential

Case study: The process encouraged the team to push themselves in several areas.


How Healthcare Facilities Can Be Truly Disaster-Resilient

Real resilience looks different than what’s written down in plans


TriasMD Breaks Ground on DISC Surgery Center for San Fernando Valley

It is set to open in Q3 2025


Bigfork Valley Hospital Falls Victim to Data Breach

The incident occurred in November 2024


AI-Driven Facilities: Strategic Planning and Cost Management 

6 factors to ensure infrastructure, operations and financial management support AI’s integration


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.