Holt Construction Completed the Atlantic Rehabilitation Institute


Holt Construction completed the Atlantic Rehabilitation Institute (ARI) for Atlantic Health System and Kindred Healthcare, LLC. The new, $24-million, state-of-the-art, two-story inpatient rehabilitation hospital located in Madison, New Jersey is the first standalone hospital to be built from the ground up by Atlantic Health System. Led by Healthcare Project Executive Wayne Lawrence, Holt delivered comprehensive construction management services on this modern, 46,000-square-foot inpatient rehabilitation care facility.

The new ARI facility includes numerous unique innovations and technologies intended to offer patients the best possible care, with a focus on helping patients prepare for the end of their hospital stay and transition to their regular life. These include a therapeutic courtyard that features different surfaces, such as gravel, paver stones, a putting green, a ramp and stairs and a simulated curb with a wheelchair cutout to practice real-world walking. Additionally, ARI features a unique Activities of Daily Living Suite, which allows patients to spend the night in a stimulated home environment complete with a full kitchen, bathroom with a standing shower and bathtub and a washer and dryer, in order to practice their return to daily life and prepare for a return to home activities, when ready.



August 28, 2019


Topic Area: Press Release


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.