Hospital Expansion Spotlights Flexible Spaces

Unit is designed with private universal rooms to flex between increasing demand for intensive care and step-down beds

By Dan Hounsell


Design and construction trends in healthcare facilities that have been on the rise over the last few years — perhaps most notably, facility flexibility — have taken center stage as systems begin to open new and expanded facilities that incorporate lessons from the COVID-19 pandemic.

Doylestown Health has completed phase three of the new $54 million, 100,000-square foot, three-story addition to Doylestown Hospital, called the Cardiovascular and Critical Care Pavilion, according to Healthcare Construction+Operations. Opened in April 2021, phase three includes the fit-out of a new 32-bed intensive/intermediate care unit on the Pavilion’s third floor.

The unit is designed with private universal rooms to flex between the hospital’s increasing demand for intensive care and step-down beds. With patient wellbeing in mind, three zones are designed in the patient room specific to clinical, patient, and family functions, indicated by a change in flooring pattern and ceiling height.

The unit focuses on patient-centered care to promote safety and noise reduction, as well as efficiency and enhanced staff workflow. Pods centered around eight patient rooms are designed to expedite response time to patient needs and to reduce movement and supplies in the corridors. Curved corridor walls allow visual connection from the nurse station to the decentralized stations and into the rooms.



June 25, 2021


Topic Area: Interior Design


Recent Posts

Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


Geisinger Finds Success with Violence Prevention Efforts

Their safety measures included training staff in de-escalation, active-shooter response drills and equipping 6,000 employees with duress notification badges.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.