Innovative Modular Solutions receives first place for temporary healthcare building at modular industry's annual conference.


Innovative Modular Solutions (IMS), headquartered in Oswego, Illinois, received a first place award at the annual Modular Building Institute (MBI) Convention on March 18 in Las Vegas, Nevada.

MBI’s Awards of Distinction recognizes modular construction projects that demonstrate architectural excellence, technical innovation, cost-effectiveness, energy efficiency, and an accelerated construction timeline.

IMS and the project team provided modular buildings to a provider of pre-engineered radiation shielding equipment to supplement their facility housing, a Linear Accelerator used to treat small animals at Iowa State University (ISU), a major Midwestern Research University.

The modular portion of the building, 598 sq. ft., features all steel framing that was designed to support a site-built roof. The floor in the Control Room was designed to allow the 10,000 lb. Linear Accelerator to be rolled from the existing building through the modular and into the vault.

IMS assembled a team that included Art’s Way Scientific, Invision Architects, Bishop Consulting Engineers, MEP Engineers, and Pyramid 1 to design, manufacture, and install the support buildings. The modules were delivered at 75 percent completion to allow for necessary connections to be made between the Linear Accelerator located in the vault and the Control & Mechanical Rooms of the modular building. IMS worked with local trade contractors to complete the installation.

Each year the Awards of Distinction are given to recognize the best modular building construction projects completed by MBI members. An impartial panel of industry and non-industry construction and code experts, architects and engineers, and marketing professionals review each entry.

“It is again an honor for IMS to win an award!” commented Kevin Maiden, Vice President of IMS. “We attribute all of our awards to our committed and dedicated employees, vendors and subcontractors. We are also honored to have great diverse and open-minded customers that allow the modular industry to provide a high-end product that both looks and performs very well. We are especially proud of this building because of its diverse use.”



April 17, 2019


Topic Area: Press Release


Recent Posts

Aligning Construction and Facility Activities to Minimize Problems

Project managers need to address risks early to prevent issues during construction and renovation projects.


Cooper University Health Care Breaks Ground on 'Project Imagine'

The groundbreaking launched the first phase of a $3 billion expansion of the Health Sciences Campus in Camden, New Jersey.


3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.