Kingspan Unveils Kooltherm K20 Concrete Sandwich Board for Tilt-up and Precast Walls


Commercial construction professionals are always looking for higher performance and smaller dimensions in the materials with which they work. To address those demands, Kingspan Insulation has introduced the new Kooltherm® K20 Concrete Sandwich Board, a premium performance rigid thermoset insulation that is ideal for tilt-up and precast concrete wall applications. It offers a higher R-value per inch than any commonly used insulation and is designed to enable thinner wall assemblies, helping to maximize building space.

“The demands on architects and construction engineers to get more out of their designs has put pressure on insulation suppliers to develop thinner materials that offer even more performance,” said Alswinn Kieboom, managing director, Kingspan Insulation North America. “With Kooltherm® K20 Concrete Sandwich Board, we have responded in full force. The product is easy to install, delivers outstanding performance and is already deployed in several projects around the country.”

The core of Kingspan Kooltherm® K20 Concrete Sandwich Board is a premium performance rigid thermoset fiber-free phenolic insulant manufactured with a blowing agent that has zero Ozone Depletion Potential (ODP) and low Global Warming Potential (GWP). It offers an R-value of 17 on 2 inches, outstanding fire and smoke performance and is unaffected by air infiltration.

Kingspan Kooltherm® K20 Concrete Sandwich Board is available in standard sizes or can be ordered in custom lengths, and comes in R-values ranging from 13.5 to 40.

For more information visit www.kingspaninsulation.us

 

 



March 16, 2017


Topic Area: Press Release


Recent Posts

3 Ways to Secure a Healthcare Facility

As workplace violence grows in healthcare, being aware of different security methods can help prevent and address dangerous situations.


Use Cases for Insulated Metal Panels in Healthcare Building Projects

Case study: The UC Medical Center selected IMPs for its ongoing revitalization project.


Memorial Healthcare System Plans Two New Freestanding Emergency Departments

Construction is expected to begin in early 2025 and complete by mid 2026.


Communication Proves to Be Essential Task During Design Phase

Projects go over more smoothly when people are transparent and communicating openly.


Northwest Healthcare Acquires Carbon Health Urgent Care Centers in Arizona

With this acquisition, Northwest Healthcare has more than 80 sites of care.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.