Larson Electronics LLC Releases Three Stage Light Mast with Gas Generator


Larson Electronics LLC, a leading manufacturer of industrial lighting, released a three-stage light tower to safely and effectively deploy lights and other equipment. This light tower features a rotating boom, single axle trailer, a job box and a 12V fan for cooling with a 9kw gas powered generator.

The LM-12-FM-TLR6-JBF light tower assembly includes a steel light mast with a telescoping boom that can be extended to 30 feet for wide coverage or collapsed to 14 feet for smaller applications. The mast is elevated using an included 1,000-pound hand winch with 3/16-inch cable and extended to its full height using a second 1,000-pound hand winch. This light tower can easily support and lift 150-pound fixtures.

This light tower assembly is supported by a 9kW gasoline-powered, continuous generator that offers 9kW of peak wattage and 7kW of continuous wattage. A 15-hp OHV engine allows operators to power 120V and 240V equipment via six outlets and a standard 12V car plug. The generator holds up to 6.5 gallons of fuel and consumes gasoline at a rate of 1.44 gallons per hour, resulting in a runtime of 10 hours per tank. The unit is equipped with automatic voltage regulation, fuel gauge, low oil shutdown and a wheel kit, for safety and monitoring.

The LM-12-FM-TLR6-JBF is equipped with a job box that allows operators to store gear and equipment when the light tower is deployed. The job box is powder coated for durability and offers protection from the elements for stored equipment and gear. The entire assembly is mounted onto a 14` single axle trailer for seamless transportation.

"The industrial market’s demand for equipment that caters to remote sites continues to grow," says Rob Bresnahan, CEO of Larson Electronics LLC. "This portable tower provides operators with quick deployment of electronics, monitoring systems, cameras and more, in an easily transportable unit."  

Larson Electronics LLC



September 12, 2018


Topic Area: Press Release


Recent Posts

Cleanliness in Hospitals: Clinical Priority and Community Perception

EVS managers and communities value cleanliness for complementary reasons: managers for safety and compliance, communities for trust and comfort.


Dana-Farber Receives $50M Gift for Planned Cancer Hospital

A $50 million grant from the Yawkey Foundation will support construction of Dana-Farber Cancer Institute’s planned 450,000-square-foot cancer hospital.


Clarinda Regional Health Center Reports Data Security Incident

On or around December 15, 2025, Clarinda learned that certain data within its network may have been accessed without authorization.


Gaps in Nurses' Environmental Cleaning Knowledge Grow Amid Rising EVS Pressures

Environmental cleaning is crucial in preventing HAIs, but when the responsibility falls to those outside of EVS teams, problems arise. 


Ground Broken on the Southern Nevada Forensic Facility

Construction on the new secure forensic psychiatric hospital is expected to be completed in 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.