Legrand to Display its Latest Wattstopper and Solarfective Solutions at LightShow West 2017


Legrand, North & Central America will be displaying its latest solutions in Human Centric Lighting (HCL), Digital Lighting Management (DLM), Architectural Dimming, and commercial shading from brands Wattstopper and Solarfective at Booth #542. In addition, Legrand lighting control experts Charles Knuffke and Shannon Markey will be presenting on the topics of the Title 24 energy code’s mandatory lighting and power control requirements and specifying occupant friendly lighting control systems.

Legrand products on display highlight the breadth of customizable and integrated solutions that are easy to specify and enable simple and seamless management of natural and artificial light:

  • The integration of Human Centric Lighting solutions with Wattstopper DLM (including DLM wireless projects) and Architectural Dimming platforms takes the complexity out of tunable lighting projects with an integrated, turnkey solution for advanced lighting systems that are easy to design, install, and control. The combination of advanced tunable LED light engines and accompanying color control switches (DLM Color Control Preset Switch and DLM Color Control Schedule Switch) ensures simple and intuitive control. For DMX control of fixtures enabled with the Lumenetix® araya5® LED light engines, the Equinox line of touchscreens and mobile app offer precise control of HCL and full color lighting.
  • A new wireless networking solution for DLM features a Wireless Network Bridge and Border Router that allows contractors to network DLM rooms together without the need for Segment Network Wire (MS/TP), simplifying room-to-room connectivity and installation, and eliminating potential start-up delays caused by wiring issues. Most importantly, it uses advanced security measures, and implements an independent network protected by AES 128-bit encryption that is separate from the customer’s IT network.
  • Solarfective commercial shading systems integrate seamlessly with Wattstopper’s Architectural Dimming platform ensuring commissioning is done quickly and easily, providing greater efficiency and time savings to projects. The combination of a wide selection of performance fabrics with proven controls technology make Solarfective systems easy to specify. Shading systems can be customized for oversized applications, unique skylights, and light shelves. 

 

 



October 16, 2017


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.