Focus: Fire-Life Safety / Column

Life Safety Q&A: Fire damper testing frequency for longterm care facilities

Brad Keyes discusses fire damper testing frequency for longterm care facilities

By Brad Keyes / Special to Healthcare Facilities Today


Q: I work in a longterm care facility. It used to be that fire dampers had to be tested/inspected every four years, but I’ve heard that has changed with the new 2012 LSC. Now fire dampers are only required to be tested/inspected once every six years. I am perplexed because I cannot seem to locate where in the LSC it is written. Can you please tell me where it is written that we can now test fire dampers once every six years?

A: You seem to have it backwards. Section 8.3.3.1 of the 2012 Life Safety Code requires compliance with NFPA 80 for all openings (i.e. doors, ductwork, windows, etc.) in fire-rated barriers. Section 19.4.1.1 of NFPA 80-2010 says fire dampers in hospitals are required to be tested and inspected every six years; for all other facilities the test and inspection frequency is every four years.

Since longterm care facilities are not hospitals, you would be required to test and inspect your fire dampers once every four years. The same holds true for smoke dampers.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



September 27, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

Parking: Where the Outpatient Land Crunch Shows First

Healthcare systems that treat parking as a strategic design variable from the first feasibility pass will have more sites to choose from.


Clear Behavioral Health Opens New Outpatient Mental Health Center in Anaheim Hills

It offers an intensive outpatient program (IOP) for adults and teens ages 13 to 17 across east Anaheim and the surrounding communities.


Bon Secours Begins Construction on Freestanding Emergency Department in Norfolk

It is expected to open in late 2027.


The OR HVAC Puzzle: Why Individual Systems Are on the Rise

Extra penetrations, tight clearances and strict humidity needs—design experts explain what it really takes to plan dedicated units for each operating room.


Skanska Completes Renovation of Specialized Care Facility for Sutter Health

The project was delivered through a highly coordinated effort, utilizing advanced construction methodologies to maintain efficiency.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.