Focus: Fire-Life Safety / Column

Life Safety Q&A: Fire damper testing frequency for longterm care facilities

Brad Keyes discusses fire damper testing frequency for longterm care facilities

By Brad Keyes / Special to Healthcare Facilities Today


Q: I work in a longterm care facility. It used to be that fire dampers had to be tested/inspected every four years, but I’ve heard that has changed with the new 2012 LSC. Now fire dampers are only required to be tested/inspected once every six years. I am perplexed because I cannot seem to locate where in the LSC it is written. Can you please tell me where it is written that we can now test fire dampers once every six years?

A: You seem to have it backwards. Section 8.3.3.1 of the 2012 Life Safety Code requires compliance with NFPA 80 for all openings (i.e. doors, ductwork, windows, etc.) in fire-rated barriers. Section 19.4.1.1 of NFPA 80-2010 says fire dampers in hospitals are required to be tested and inspected every six years; for all other facilities the test and inspection frequency is every four years.

Since longterm care facilities are not hospitals, you would be required to test and inspect your fire dampers once every four years. The same holds true for smoke dampers.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



September 27, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

How Efficiency Checklists Help Hospitals Save Energy, Water and Money

Keith Edgerton explains how a simple, systematic tool can help healthcare facilities identify savings, support sustainability goals and reinvest in long-term decarbonization.


Designing with Heart: Seen Health Center Blends Cultural Warmth and Clinical Care

Case study: The Alhambra-based facility uses Wilsonart Woodgrains to create a space where comfort, tradition and durability come together for an elevated senior care experience.


Rutgers Health and University Hospital Breaks Ground on Campus Expansion

The groundbreaking follows the long-awaited demolition of administrative offices built in the 1970s.


What to Consider When Modernizing Healthcare Facilities

While there has been a call to preserve old buildings, healthcare facilities need to weigh the options of patient care.


Corewell Health Beaumont Troy Hospital to Build New Tower

The tower is expected to be completed in 2030.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.