Focus: Fire-Life Safety / Column

Life Safety Q&A: Fire-rated frames

Brad Keyes discusses regulations for fire-rated frames

By Brad Keyes / Special to Healthcare Facilities Today


Q: My hospital is a behavioral health hospital converted from an acute hospital. The doors on patient rooms and mostly all doors in this building are solid core doors....which are fire rated. My office door and most in this wing are also lead lined. We need the solid core doors for the patient rooms due to their behavior....regular doors would be torn up quickly. How do I comply with the new ruling on fire-rated door inspections in this situation?

A: You can do one of two actions:

• You can test and inspect the fire-rated door assemblies on an annual basis in accordance with 19.2.2.2.1 and 7.2.1.15.2

• You can remove the fire-rated label on the door assemblies if the door is not required to be a fire-rated door assembly

Even if the door is a labeled fire-rated door assembly but is located in a barrier that is not required to be a fire-rated barrier, you must still maintain the door in accordance with NFPA 80, which requires annual test and inspection. However, if the barrier is not required to be a fire-rated barrier, and you remove the labels (on the door and on the frame) then the door is no longer a fire-rated door assembly and you do not have to maintain it as such.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



June 28, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.