Lunera lighting expands plug and play Helen lamp linear LED tube product family


Lunera Lighting, Inc., a leader in lighting innovations accelerating the transformation to advanced LED technology, announced the expansion of the Helen Lamp linear plug and play product family today. Building owners and operators can upgrade their lighting infrastructure with four-foot T8 linear ballast-bypassed (120V-277V line driven) or four-foot and two-foot T8 linear ballast-driven LED lamps. For high-bay areas, the ballast-driven four-foot T5HO LED lamp is a high-lumen alternative to HIDs. These high performance linear LED lamps instantly lower energy cost by as much as 55 percent. 

Like the four-foot Helen Lamp ballast driven T8 announced recently, these new linear LED lamps stand above other T8 and T5 replacement solutions through the use of top-quality glass construction with end-necking for strength. The linear lamps won't yellow and/or sag over time and a broad 330-degree beam angle enables the lamps to perfectly replicate a fluorescent tube's performance in the fixture. Compact end caps maximize the illuminated length of the tube, adding lumens and evenly distributing light. 

Lunera's linear lamps include high performance LEDs mounted on a flexible PCB for improved reliability and better thermal conduction. These robust LEDs are powered at only 40 percent of their rated drive for improved efficacy up to 123 lm/W and provide an extended lamp life of 50,000 hours to L70. The lamps are available in a variety of color temperatures to create just the right ambience for any interior environment.

 



April 19, 2016


Topic Area: Press Release


Recent Posts

3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.