Mannington Commercial partnered with Consolidated Carpet to deliver more than 12,700 square yards of heterogenous resilient sheet flooring to the SUNY College Old Westbury campus in New York for one of the latest US Army Corps of Engineers temporary healthcare facilities last week. Mannington along with their distributor, Salesmaster, was able to provide stock specifications, arrange logistics and ship the first 2,700 square yards going in over the University’s existing gymnasium flooring just one day after receiving the inquiry. An additional 10,000 square yards were shipped just one week later to be installed in an all new temporary care facility on the campus.
The gymnasium installation presented a unique set of challenges for Consolidated Carpet’s installers as the material could not be glued down and had to meet stringent infection control guidelines for healthcare flooring. Mannington’s team of healthcare segment leaders and Consolidated’s expert installers determined a heterogeneous resilient sheet was the right solution for the project and decided on a temporary tape installation system. A 12’ roll width was chosen to mitigate the number of seams that had to be heat welded throughout the facility and cut down on overall installation time.
Mannington Commercial is making certain that proper flooring material that aids in infection control, cleanability and slip resistance is available for this ever-evolving healthcare crisis. With 7 million square feet of resilient sheet in inventory and the ability to produce up to 1 million square feet a week domestically, Mannington continues to explore every possibility to support our communities as we respond to COVID-19. For additional information on our healthcare flooring solutions forward your inquiries to: mannington.hc2020@mannington.com
April 16, 2020
Topic Area: Press Release
Recent Posts
How Architects Shape the Future of Healthcare Facilities
Healthcare architecture is more than just designing and building hospitals.
UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital
The partners plan to break ground together on the new NC Children’s campus by 2027.
Sarasota Memorial Hospital Plans to Build New Facility in North Port
The six-story, 100-bed hospital is slated to open in fall of 2028.
CMMS, Data and the Path to Compliance
Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.
Healthcare is a Major Ransomware Target
Healthcare is the third-most-targeted sector, according to the report.