Marley MD Everestä Counterflow Cooling Tower’s Modular Design Speeds Site Delivery and Installation


SPX Cooling Technologies, Inc., a full-line, full-service industry leader in the design and manufacture of evaporative and air-cooled heat exchangers, announces the new Marley MD Everest, a modular counterflow cooling tower. The Marley MD Everest Cooling Tower is designed to meet today’s process cooling demands, and is suitable for power generation plants, chemical, oil and gas plants, and other process applications with a wide range of thermal loads.

Whether designing a new plant or replacing an aging traditional site-constructed cooling tower, the MD Everest tower’s pre-configured design offers significant advantages that enable safer assembly processes, including up to 60 percent faster delivery and 80 percent faster installation compared to field-erected cooling towers.

The MD Everest counterflow tower’s robust structure meets seismic and wind load requirements per ASCE and IBC building codes, and withstands the rigors of process cooling applications using heavy-duty, corrosion-resistant materials. Industrial-strength Marley mechanical components include a five-year maintenance-free System 5 Marley Geareducer® gear drive; energy-efficient, low-clog PVC heat exchange fill media; and Motor Outside Airstream (MOA), standard. The MD Everest also includes a five-year mechanical component warranty.

MD Everest cooling tower arrives at the site in modules that are built and assembled in a controlled factory environment, which facilitate high quality and efficient installation. Its thermal performance is pending certification by the Cooling Technology Institute (CTI), eliminating the need and expense for on-site testing. 

For more information, please visit www.spxcooling.com.



February 8, 2018


Topic Area: Press Release


Recent Posts

All Eyes on Gen Z as They Enter the Workforce

As the labor gap widens in the facilities industry, not many managers trust Gen Z to fill that hole.


Cleveland Clinic Starts Fundraising Effort for New Hospital in West Palm Beach

Plans for the new hospital include approximately 150 inpatient beds, an emergency department, a medical office building and an ambulatory surgery center.


Cultivating a Workforce in the Face of Skilled Trade Shortages

Facilities managers must make concerted efforts to attract skilled trade workers to their facilities and retain them long term.


Prime Healthcare Acquires 8 Ascension Hospitals in Illinois

They also acquired a number of other facilities in this acquisition.


Charging Ahead: Incentives Driving EV Charging in Healthcare Facilities

Manufacturers discuss how incentives impact the decision-making process.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.