Focus: Emergency Preparedness

Meeting the requirements for emergency equipment

Employees should be trained on how to use the emergency equipment fixtures before they handle hazardous chemicals


For companies maintaining or considering emergency shower and eyewash stations, there are two key standards to remember, according to an article on the Occupational Health & Safety website.

The ANSI/ISEA Z358.1-2014 American National Standard for Emergency Eyewash and Shower Equipment is an essential resource — visit ISEA's www.safetyequipment.org website to order it. 

This consensus standard outlines the minimum equipment performance criteria for this equipment. It specifies flow rates, water temperature delivery, testing, and much more.

Z358.1 is the leading international standard for implementation of eyewash and shower equipment. On the standard’s page on its website, ISEA points out what a wide range of industries need to install and maintain this emergency equipment, listing "manufacturing and processing facilities, construction sites, laboratories, medical and healthcare offices, refineries and other workplaces."

The other key standard is Occupational Health & Safety's (OSHA's) first aid standard, the one that explains the requirement for certain facilities in those and other industries to install shower or eyewash equipment. OSHA's 29 CFR 1910.151(c) says, "Where the eyes or body of any person may be exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within the work area for immediate emergency use."

Read the article.

 

 



January 10, 2019


Topic Area: Safety


Recent Posts

3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.