Midmark Tabletop Sterilizers Updated


Midmark Corp., a leading medical solutions provider for ambulatory care, today announced an update to the Ritter M9 and M11 Steam Sterilizers, a line of tabletop sterilizers designed to be safe and dependable. The stainless-steel construction and third-party ASME certification of these sterilizers help contain contamination and maximize the efficiency of instrument cleaning and sterilization processes.

“In order for instrument processing equipment to be effective, it must be simple to use and maintain while also helping the user adhere to proper instrument processing protocols,” said Kurt Forsthoefel, director of medical marketing, Midmark. “The Midmark line of updated steam sterilizers provides the solid foundation practices need for worry-free infection prevention measures in their facility.”

The sterilizer cycle times have been updated to align with FDA recommended 4-minute standard cycles— this aligns with most process challenge devices. The sterilizers have improved drying capabilities, are available in a new color and include a pouch rack. The optional printer accessory has been updated to a quiet thermal printer. 

Midmark designers help reduce bottlenecks and optimize instrument workflow to ensure customers meet the busy demands of their practices. The Midmark team considers the many ways space and workflow design will drive efficiencies in instrument processing centers.

For more information about Midmark instrument processing equipment, visit midmark.com.



October 7, 2019


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.