NEMA: New Standard Minimizes Cable Energy Loss for Power over Ethernet Lighting Systems


The National Electrical Manufacturers Association (NEMA) released a new installation standard designed to ensure minimal energy loss for power over ethernet (POE) lighting systems. ANSI Accredited Standards Committee on Lighting Systems published ANSI C137.3 American National Standard for Lighting Systems—Minimum Requirements for Installation of Energy Efficient Power Over Ethernet (POE) Lighting Systems. NEMA serves as the secretariat for the standard. 

The energy efficiency of a POE lighting system depends on three elements: power source equipment (PSE) efficiency, powered device (PD) efficiency, and cable energy losses. This standard specifies cable and installation practices to limit the electrical energy losses of the cable between the PSE and the PD. 

“ANSI C137.3 provides the much-needed standardization of cable requirements for use by installers of PoE lighting systems. It ensures that POE Lighting will provide high-energy efficiency in every building installation that is complying with this standard,” said Robert Hick, vice president of R&D Engineering, Leviton Lighting and Energy Solutions, and technical coordinator of ANSI C137.3. 

NEMA’s Lighting Systems Division, as the secretariat of ANSI’s ASC C137 for Lighting Systems, is looking for industry experts in the User and General Interest categories to participate in standards development activities. Contact NEMA at nemalighting@nema.org if you are interested. Please indicate your interest category and your area of expertise.



July 11, 2017


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.