Modern HVAC systems present both new challenges and new opportunities when integrating with electrical systems, according to an article on the Consulting Specifying Engineer website.
Mechanical systems have evolved not only technologically, but also in how they're purchased.
Tight project schedules are driving contractors to purchase large mechanical equipment components well in advance of the design completion.
Engineers should be familiar with the technical differences in the modern HVAC systems, and how to account for packaged mechanical equipment the article said.
Managing IAQ in Healthcare Facilities During Wildfires
Building Hospital Resilience in an Era of Extreme Weather
From Cooling Towers to Cost Savings: Hospital Seizes Power-Saving Opportunity
Design Standards as Strategic Assets
Rising Violence is Exposing Gaps in Hospital Security