New High-Capacity, Front-Accessible HDD Models of exacqVision A-Series Recorders Provide Easy Expansion


Johnson Controls introduces a new line of high-capacity, front-accessible hard disk drive (HDD) recorders within its exacqVision A-Series portfolio in response to the increasing demands for video storage expansion.

The use of video surveillance to detect, deter and prosecute crime has grown significantly, and increases in camera resolutions and frame rates have caused the need for video storage to surge at an unprecedented rate.

The new front accessible recorders feature eight front-accessible storage bays with up to 80TB of storage available, all in a smaller, more compact 2U chassis. The flexible configuration provides hassle-free maintenance and service, allowing users to simply shut down the system and add hard drives from the front of the chassis for a future-focused surveillance operation.

Consistent with the full suite of exacqVision A-Series hybrid and IP recorders, the servers come with 4 IP camera licenses, support up to 64 IP and 32 analog cameras, and include a three-year warranty and three-year SSA for all cameras on the system.

Available with either Windows 10 or Ubuntu 16.04 operating systems, the new models of the exacqVision A-Series recorders are configurable with optional Quad NICs and RAID 5, making them ideal for enterprise environments needing expansion and reliability assurance. For more information, visit www.exacq.com.

 



May 11, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.