New YORK YK-EP “Efficiency Plus” Centrifugal Chiller provides energy-efficient savings


The YORK brand of Johnson Controls has launched the YORK YK-EP “Efficiency Plus” water-cooled centrifugal chiller. The chiller achieves five percent capacity and efficiency improvements over the previous model. It utilizes a patent-pending mechanical compression economizer cycle to boost performance over conventional chiller platforms. 

The YK-EP uses a YORK OptiSpeed™ variable speed drive, which can accept medium or high voltage power, trimming average annual energy consumption up to 30 percent. The chiller is able to operate with 50 degrees Fahrenheit (10 degrees Celsius) low entering condenser water temperature (ECWT) compared to 75 degrees Fahrenheit (23.9 degrees Celsius) of other chillers, trimming instantaneous energy consumption as much as 50 percent. Additionally, in facilities with multiple YK-EP chillers, energy savings can be accomplished with series-counter flow arrangement. This reduces the compressor work needed on each chiller, cutting system energy use by as much as 8 percent at design conditions.

The YK-EP chiller, capacity of 2,500-3,500 tons, is ideal for large tonnage applications including district cooling or large central plants (universities and airports) and gas-turbine inlet-air cooling. Current customers selected the YK-EP for its ability to reach required capacity levels at real-world conditions and its ability to operate at different low ECWT, which provides significant energy savings. 

For more information, please visit www.johnsoncontrols.com/buildings/hvac-equipment/chillers/yk-ep-centrifugal-chiller-with-economizer.



March 11, 2016


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.