New energy management motor starter from Greenheck


MSEM starterGreenheck’s new fully programmable energy management motor starter, Model MSEM, can be specifically adapted to the user’s needs. Available for single-phase (up to15 HP) or three-phase (up to 300 HP) commercial or industrial applications, Model MSEM features a Hand/Off/Auto keypad with LCD display to easily adjust settings. Model MSEM offers five different control inputs including two separate auto run inputs, permissive input, Emergency Shutdown and Fireman’s Override; two status outputs; under/over voltage and under/over power protection; and electronic overload for real-time current monitoring for motor protection. For damper control, Model MSEM can be specified for 24VAC or 120VAC damper power to open the damper when the fan is commanded to start. Model MSEM also has a limit switch input to ensure that the fan does not start until the damper is fully opened.

Options include ground fault protection and time delays, as well as one of four optional boards: power monitoring board, BACnet communications board, Modbus communications board, or Ethernet I/O (fault logging) board.

Greenheck is the worldwide leader in manufacturing and distributing air movement and control equipment.

For more information about Greenheck products, visit www.greenheck.com or contact Greenheck, PO Box 410, Schofield WI 54476-0410, (715)359-6171, FAX (715)355-2399.

 



January 14, 2015


Topic Area: Press Release


Recent Posts

Technology Trends for Healthcare Real Estate in 2025

AI and other sophisticated technologies are looking to influence healthcare real estate in the new year.


Advocate Healthcare Invests $1 Billion Into Chicago's South Side

The expansive investment in a wellness model is the direct result of an extensive community input process over much of 2024.


Children's Medical Center Plano Opens New Patient Tower

The expansion will triple the campus’ bed capacity.


Layered Security on the Rise in Facilities

More than three-quarters of survey respondents say digital and physical security integration is critical.


OhioHealth Plans New Comprehensive Outpatient Cancer Center

Construction is slated to begin in the spring of 2026, with the goal to open for patient care in the spring of 2029.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.