New water pre-treatment systems increase efficiency and minimizes maintenance


Nortec Humidity introduces the next generation in Water Pre-treatment Systems, utilizing the latest methods to remove contaminants and hard minerals from water. During this two-step process water is pushed through an activated carbon filter to eliminate the chlorine, and then treated with a duplex softening system removing contaminants and hardness caused by calcium and magnesium.

A “Water Pre-treatment System Replacement Program” has been designed for customers who have been using a Nortec Water Pre-treatment System for its expected life span or longer. Nortec service will provide a complimentary quote for a certified technician to inspect or upgrade a customer’s current system. 

Why upgrade your water pre-treatment system?

• Increased reliability and energy savings –Kinetic energy from the moving water is used rather than electric power. 

• Adds efficiency saving money – Countercurrent  and metered regeneration conserves water and reduces salt use.

• Minimal maintenance and repairs – Corrosive resistant valves and tanks, with no back flushing of the carbon filter reduce the need for service.

• Prolong the life of the system – Twin tank design allows for a continuous clean water supply even during regeneration.

The “Water Pre-treatment System Replacement Program” is the first service product to launch in a series of new service products slated for introduction. Nortec is the leading manufacturer of commercial/industrial humidification and evaporative cooling systems for more than 40 years. We have the technology and application expertise to meet the needs of any application. 

 



April 12, 2016


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.