New water pre-treatment systems increase efficiency and minimizes maintenance


Nortec Humidity introduces the next generation in Water Pre-treatment Systems, utilizing the latest methods to remove contaminants and hard minerals from water. During this two-step process water is pushed through an activated carbon filter to eliminate the chlorine, and then treated with a duplex softening system removing contaminants and hardness caused by calcium and magnesium.

A “Water Pre-treatment System Replacement Program” has been designed for customers who have been using a Nortec Water Pre-treatment System for its expected life span or longer. Nortec service will provide a complimentary quote for a certified technician to inspect or upgrade a customer’s current system. 

Why upgrade your water pre-treatment system?

• Increased reliability and energy savings –Kinetic energy from the moving water is used rather than electric power. 

• Adds efficiency saving money – Countercurrent  and metered regeneration conserves water and reduces salt use.

• Minimal maintenance and repairs – Corrosive resistant valves and tanks, with no back flushing of the carbon filter reduce the need for service.

• Prolong the life of the system – Twin tank design allows for a continuous clean water supply even during regeneration.

The “Water Pre-treatment System Replacement Program” is the first service product to launch in a series of new service products slated for introduction. Nortec is the leading manufacturer of commercial/industrial humidification and evaporative cooling systems for more than 40 years. We have the technology and application expertise to meet the needs of any application. 

 



April 12, 2016


Topic Area: Press Release


Recent Posts

AI-Driven Facilities: Strategic Planning and Cost Management 

6 factors to ensure infrastructure, operations and financial management support AI’s integration


Double Homicide Suspect Hides from Police in Upstate Community Hospital

The alleged suspect passed through the hospital’s weapons detection system, alerting the facility and police


McCarthy and HOK Break Ground on Kedren Children's Village

The estimated completion of the facility is in summer 2027


Thousands of Healthcare Workers Laid Off

As part of DOGE and RFK’s plan to reduce federal spending, thousands of healthcare workers have lost their jobs in recent weeks.


Construction Tops Off at Hackensack Meridian Health and Wellness Center

Located at a major transit hub, the new facility is expected to open in fall 2025.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.