North Carolina Energy Conservation Code Goes into Effect


 North Carolina’s 2018 State Building Code went into effect January 1, 2019 complete with an updated Energy Conservation Code for Commercial Buildings. The new code includes the 2015 IECC©along with North Carolina specific amendments that need to be applied to any building submitted for permitting.

With the adoption of the 2018 North Carolina State Building Code for Energy Conservation (NCECC), North Carolina continues to increase the energy efficiency of its new commercial buildings, providing lower energy operating costs to building owners and managers.

Harold Jepsen, Vice President of Standards and Industry, Building Control Systems at Legrand, North & Central America, has outlined the biggest lighting control changes in the upcoming code updates.
 

Lighting Control Provisions Changes

  • All commercial buildings must comply with automatic shut off requirements, regardless of square footage. Buildings under 5,000 square feet are no longer exempt from this provision as in the prior code. 
     
  • Occupancy sensor control requirements used for automatic lighting shut off have been expanded to include rooms defined as being used for multipurpose, copy, print, mechanical, electrical, lounges, computer server, and warehouse spaces. The updated code also includes the eight defined uses already existing under the 2012 NCECC.
     
  • Warehouse aisles and open areas must reduce lighting by at least 50 percent when not occupied. This will increase energy savings during normal warehouse operating hours when there is no activity in individual storage aisles and open areas by reducing, or completely turning off unneeded lighting.
     
  • Hotel and motel guestrooms must automatically turn off lighting and switch receptacle, so lighting is not left on when guests leave the room.

Additional Code Changes

 Outside of lighting controls, the 2018 NCECC has also adopted changes for lighting power allowances and efficiency package options, including:

  • Revised lighting power allowance tables that reduce lighting power density in many common spaces from five to 12 percent.
  • Added lighting measures for the Additional Efficiency Package Options.
  • Revised lighting control system functional testing requirements.

Solutions & Resources

Compliance design examples for the new code are offered for free at Legrand. Visitors can find assistance in selecting appropriate controls and code compliant sequence of operations for many typical commercial building space types. Resources include:

 



February 1, 2019


Topic Area: Press Release


Recent Posts

How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


Healthcare is a Major Ransomware Target

Healthcare is the third-most-targeted sector, according to the report.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.