OSHA Will Enforce Beryllium Standard Starting in May


The Occupational Safety and Health Administration (OSHA) announced today that it will start enforcement of the final rule on occupational exposure to beryllium in general, construction, and shipyard industries on May 11, 2018. This timeframe will ensure that stakeholders are aware of their obligations, and that OSHA provides consistent instructions to its inspectors. The start of enforcement had previously been set for March 12, 2018.

In January 2017, OSHA issued new comprehensive health standards addressing exposure to beryllium in all industries. In response to feedback from stakeholders, the agency is considering technical updates to the January 2017 general industry standard, which will clarify and simplify compliance with requirements. OSHA will also begin enforcing on May 11, 2018, the new lower 8-hour permissible exposure limit (PEL) and short-term (15-minute) exposure limit (STEL) for construction and shipyard industries.  In the interim, if an employer fails to meet the new PEL or STEL, OSHA will inform the employer of the exposure levels and offer assistance to assure understanding and compliance.

Under the Occupational Safety and Health Act of 1970, employers are responsible for providing safe and healthful workplaces for their employees. OSHA’s role is to ensure these conditions for America’s working men and women by setting and enforcing standards, and providing training, education and assistance. For more information, visit www.osha.gov.



March 13, 2018


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.