Protect Lighting Control Investments with Wattstopper Technology-Enabled Service Contracts from Legrand


Legrand, North & Central America announced the launch of Wattstopper Technology-Enabled ServiceContracts, a new offering that brings added convenience and protection to lighting control system investments. The service contracts combine immediate remote support with onsite support and training delivered by the Wattstopper Remote Operations Center (ROC). The ROC is an extension of Legrand’s brand new Service Center of Excellence located in Richardson, Texas that has dedicated support technicians with the experience and resources to help maintain and optimize a building’s lighting control system. Demonstrations will be shown at LIGHTFAIR International 2018 at booth #1843.

Legrand’s new service contracts merge its industry-leading secure remote support technology (RACCESS) with dedicated factory-trained ROC technicians and field technicians to provide a complete set of coverage options for customers. The most common lighting control system issues can be addressed immediately with remote support, while more complex issues are resolved promptly onsite by a factory-trained technician. Both networked Wattstopper Digital Lighting Management and Architectural Dimming lighting systems can be covered under the new service contracts. Two standard options are being rolled out now:

  • Connect Plus is the priority response package that includes dedicated ROC support, proactive system analytics, and priority onsite response. Annual onsite training and two annual onsite system tuning visits are also included in this package. Connect Plus is ideal for customers who need protection from unplanned interruptions and who want to keep their system running efficiently.
     
  • Connect Prime is the premium response package that incorporates 24/7 ROC support, proactive system analytics, and next day onsite response for issues that aren’t able to be resolved remotely. This package also includes two annual onsite trainings and quarterly onsite system tuning visits. Connect Prime is best for customers with mission-critical facilities where lighting issues or interruptions require immediate attention and resolution.

“Having a service contract provides peace of mind throughout the lighting control system’s entire lifecycle beyond project installation and completion,” said Ray Acciardo, Director, Services Marketing at Legrand. “As lighting systems grow in complexity and become increasingly connected and integrated, service contracts for lighting controls are a natural progression much like HVAC, fire, and security building systems today.”  legrand.us/wattstopper



May 10, 2018


Topic Area: Press Release


Recent Posts

3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.