Puck Lamp selected for IES 2015 progress report


MaxLite has announced that the LED Puck Lamp has been recognized by the Illuminating Engineering Society (IES) Progress Committee as providing advancements in the art and science of lighting, and will be featured in the prestigious Progress Report for 2015. This year’s Report will be presented on November 9, 2015 at the IES Annual Conference in Indianapolis, Indiana, and at local IES Section meetings throughout the coming year. By being included in the Report, the Puck Lamp will be featured in the January 2016 issue of LD+A Magazine.

“We are honored that our Puck Lamp was selected by the IES Progress Committee to be included in this year’s report,” said MaxLite Vice President of Product Management and Engineering Greg Galluccio. “This recognition highlights MaxLite’s deep commitment to developing significant, energy-efficient technologies that advance the lighting industry.”

The Puck Lamp is the industry’s first GU24-base light source rated for use in fully enclosed luminaires to earn placement on the ENERGY STAR Certified Subcomponent Database (CSD). Available in two bases (GU24 and E26) and two correlated color temperatures (2700K, 3000K), the ultra-compact lamp was designed to provide efficient, quality LED lighting for shallow fixtures such as closet lights, ceiling fans, outdoor porch lights and torchieres. The Puck Lamp delivers 800 lumens, an output equivalent to that of a 60-watt incandescent lamp, from a source that is roughly the size of a hockey puck.

MaxLite will be releasing the second generation of its LED Puck Lamp this fall.

 

 



August 26, 2015


Topic Area: Press Release


Recent Posts

Waco Family Medicine Achieves Savings and Bold Design with Wood Selections

Case study: The healthcare facility incorporated over 25,000 square feet of wood and saved over $400,000.


Alleged Ransomware Administrator Extradited from South Korea

The Phobos ransomware has been used globally to target over 1,000 organizations, including healthcare.


Design Plans Unveiled for New Intermountain St. Vincent Regional Hospital

The new hospital will be a 14-floor, 737,000 square-foot facility in Billings, Montana.


Ground Broken on New Pediatric Health Campus in Dallas

The new campus will replace the existing Children’s Medical Center Dallas.


Pre-Construction Strategies for Successful Facilities Projects

Savvy decisions can help facilities meet long-term goals by creating consistency and eliminating waste.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.