Focus: Fire-Life Safety / Column

Q&A: Annual fire pump test

Brad Keyes discusses requirements for an annual fire pump test

By Brad Keyes / Special to Healthcare Facilities Today


Q: I read where the annual fire pump test requires a 30-minute churn test but does not differentiate between a diesel or electric pump (as in the weekly test). NFPA 25, 2011 edition requires only a 10-minute churn for the annual test on an electric pump. What happened to the 30-minute churn test?

A: NFPA 25-1998 did require the annual fire pump flow-test for both electric-motor driven fire pumps and engine-driven fire pumps to have a 30-minute churn test at no-flow conditions to begin the test. This was to ensure the pressure relief valve opened to allow circulating water to cool the pump when operating at standby (i.e. no-flow) conditions.

Since CMS adopted the new 2012 LSC, we are now on NFPA 25-2011. Section 8.3.3.2(1) of NFPA 25-2011 dropped the requirement for a 30-minute churn test for the annual fire pump flow-test, but still requires the churn test; it just doesn’t specify how long the churn test must be. I can only surmise that the industry figured a churn test for 30 minutes to ensure the relief valve opens is no longer required.

However, section 8.3.3.2(3) says “For electric motor-driven pumps, the pump shall not be shut down until the pump has run for 10 minutes.” This statement is in reference to the pump operating at flow conditions, and is not a reference to how long the pump must run at no-flow conditions.

The new 2012 LSC is now being enforced by accreditation organizations and by CMS. For annual fire pump flow tests from now on, you may run the churn test portion long enough to ensure the relief valve opens and dumps water. You no longer have to run the churn test for any given length of time.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs

 

 



November 23, 2016


Topic Area: Regulations, Codes & Standards


Recent Posts

Aligning Construction and Facility Activities to Minimize Problems

Project managers need to address risks early to prevent issues during construction and renovation projects.


Cooper University Health Care Breaks Ground on 'Project Imagine'

The groundbreaking launched the first phase of a $3 billion expansion of the Health Sciences Campus in Camden, New Jersey.


3 Employees Injured by Patient at Halifax Infirmary's Emergency Department

Police contained the threat and took the patient into custody.


How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.