Q&A: Fire extinguishers in chute rooms

Brad Keyes discusses requirements for fire extinguishers in chute rooms

By Brad Keyes / Special to Healthcare Facilities Today


Q: Our hospital is wondering if it is a requirement to have fire extinguishers in our linen/trash chute room? If so where can I find the code reference?

A: No… it is not a requirement to have portable fire extinguishers inside the trash/linen discharge room, or the trash collection room. However, it is a requirement to have a properly classified fire extinguisher within the maximum travel distance for that extinguisher and the level of hazard it is intended to handle from everywhere in the facility, which would include the trash collection room. The extinguisher would have to be a Class A:B and located within the maximum travel distance for a Class A:B (probably 75 feet).

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 

 

 



April 5, 2017


Topic Area: Regulations, Codes & Standards


Recent Posts

Extreme Weather: The Maintenance-Resilience Link

Extreme heat serves as stress test of the resilience of utility systems that provide power, cooling and life safety functions.


Encompass Health Lower Providence Opens in Pennsylvania

The 50-bed inpatient rehabilitation hospital is the company's 11th location in Pennsylvania.


Intermountain Health Acquires Fairbourne Building for Healthcare Hub and Medical Campus Conversion

Construction on the interior of the building is underway with the city and Intermountain working closely together on the campus.


Cooling Towers at NYC Health + Hospitals/Lincoln Test Positive for Legionella

Hospital among the positive tests at 10 cooling towers in South Bronx.


Prefabricated Wall Panels Accelerate UCF Lake Nona Medical Center Construction

Case study: StoPanel exterior wall systems helped Wal-Mark Contracting meet strict Florida wind-load requirements and complete 136 panels in just 11 days.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.