Focus: Fire-Life Safety / Column

Q&A: Temporary construction barriers

Brad Keyes discusses acceptable temporary construction barriers

By Brad Keyes / Special to Healthcare Facilities Today


Q: Per NFPA 101 2012 edition: are plastic barriers (w/zippers) no longer acceptable around construction areas though the facility is fully sprinkled?

A: No… I wouldn’t say that. But the issue is being reviewed by NFPA and a change may occur next year.

Section 19.7.9.2 of the 2012 LSC says the means of egress of any area undergoing construction, repair, or improvements must comply with NFPA 241, which is the standard for safeguarding during construction operations. Section 8.6.2 of NFPA 241-2009 says temporary construction barriers are required to be 1-hour fire rated, with ¾ hour fire rated doors assemblies if the construction area is not full protected with sprinklers. 1-hour barriers are typically steel studs with 5/8 inch thick gypsum board on both sides, with all seams taped and mudded and all screws heads mudded. If the construction area is protected with sprinklers, then the temporary construction barrier is permitted to be non-rated, but construction ‘tarps’ are not permitted as the non-rated barrier. At this time flame retardant plastic sheeting (i.e. Visqueen) will be permitted as a temporary construction barrier where the construction area is fully protected with sprinklers.

However, this issue is being reviewed by the Healthcare Interpretations Task Force (HITF) of the NFPA. At the June, 2016 meeting of HITF, the members discussed whether or not flame retardant plastic sheeting was acceptable or if it was the same as ‘construction tarps’. At that time there was not a clear consensus so no decision was made. The committee said they would review it again next year.

Unless your AHJ has specifically ruled on this issue, the HITF seemed to say that flame retardant plastic sheeting would be permitted when the construction area is fully protected with sprinklers. But, of course, that is not in writing so it is not official.

I would say continue to use flame retardant plastic sheeting until you learn otherwise.

Brad Keyes, CHSP, is the owner of KEYES Life Safety Compliance, and his expertise is in the management of the Life Safety Program, including the Environment of Care and Emergency Management programs.

 

 



October 12, 2016


Topic Area: Regulations, Codes & Standards


Recent Posts

How Architects Shape the Future of Healthcare Facilities

Healthcare architecture is more than just designing and building hospitals.


UNC Health, Duke Health Form Partnership for Stand-alone Children's Hospital

The partners plan to break ground together on the new NC Children’s campus by 2027.


Sarasota Memorial Hospital Plans to Build New Facility in North Port

The six-story, 100-bed hospital is slated to open in fall of 2028.


CMMS, Data and the Path to Compliance

Taking control of healthcare facilities data in CMMS enables managers to use it to ensure the efficient operation and maintenance of their assets.


Healthcare is a Major Ransomware Target

Healthcare is the third-most-targeted sector, according to the report.


 
 


FREE Newsletter Signup Form

News & Updates | Webcast Alerts
Building Technologies | & More!

 
 
 


All fields are required. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

 
 
 
 

Healthcare Facilities Today membership includes free email newsletters from our facility-industry brands.

Facebook   Twitter   LinkedIn   Posts

Copyright © 2023 TradePress. All rights reserved.